Al-Huda has played an active role in the rehabilitation and reconstruction after national disasters in the recent past particularly after the earthquake in 2005, the devastating flood in 2010 and for the Swat IDP’s.The rehabilitation and construction division assesses damage and need, collects and organizes resources, delivers material where needed and focuses on re-establishing basic services such as providing shelter and temporary housing for the victims of the disaster. They also provide emotional and spiritual support to help people recover. Some of the details of the rehabilitation and reconstruction services provided by Al-Huda in the past are as follows
Rohila Wali Houses Project
Visiting Areas:
- Jhanday wali
- Wasandy Wali
Date and Time:
Description of Visit:
A four-member team from Al-Huda visited Rohila Wali completed houses on Thursday, 13-10-2011. The inhabitants of the new houses were excited to meet the team, were full of appreciation and gave lots of duas alhamdulillah.

Project Monsoon 2011-2012 at Malkani (Sindh)
Report of Badin Housing :
Al-Huda International Welfare foundation has been trying to help the handicap, widows and needy in all spheres of life. In this connection, it has therefore taken the responsibility of building houses in the flood affected areas of Badin, where people were displaced due to the severe flood. These houses provided shelter to quite a few numbers of families (if not all) who were suffering under the open skies with no food and shelter. Therefore, Al-Huda welfare built 80 houses.
The main features of the Badin Housing Project are as follows:
- Construction: The construction of the project commenced on 30/03/2012 where the labor work was carried out by the locals who worked very hard to complete the project.
- The project was completed in two phases. Forty houses in first phase and forty in second phase. The cost of each house is Rs. 79,876/- and the total cost of eighty houses is Rs. 6,390,080/-
- Materials like cement, tiles, bricks and sand were bought from Badin.
- Windows, doors, tiers, garders were bought from Karachi.
- Most of the labors were the people who were candidates for the houses.
- The rooms have been built in the size of 12×13 and 12×14
- Details of the material used in this project is as follows:
Phase 1 room size 12×13
- Lal Bricks 7000
- T/R 10
- Garder 03
- Tiles 350
- Door 3’x6’ 01
- Window 2’x2’ 01
- Wages 9100/-
- Sand Less than half truck
- Cement 18 bags
- Iron for plinth Rs. 1000/-
Phase 2 room size 12×14
- Lal Bricks 7500
- T/R 11
- Garder 03
- Tiles 350
- Door 3’x6’ 01
- Window 3’x4’ 01
- Wages 10400/-
- Sand half truck
- Cement 20 bags
- Iron for plinth Rs. 1000/-
- 2)Madressah: Deeni Taleem was being imparted to the locals in Badin since a few years. Due to the local demand, the need for madressah was felt and as such madressah has been built in the same period of the housing project costing Rs. 4,76,175/- which consists of a hall 17×20, one room 12×14, one washroom 4×4 and a wuzu khana. Madressah is fully equipped with electricity.
Click here for Presentation on Malkani Project 2011

RABBI ZIDNI ILMA
– A BOOKLET COMPILED BY A STUDENT OF KHWATEEN CLUB KARACHI